Tag Archives: bikepath

Hume Council wants Upfield Bikepath Extension as part of Camp Road level crossing removal

Excerpt from Hume Council walking and Cycling Strategy Action Plan 2010-2015

The Upfield bike path, a shared use path that thousands of cyclists and pedestrians use every day, strangely doesn’t go all the way to Upfield. In fact it doesn’t exist, except as a poor dirt track in places beside the railway line, within Hume municipality. But Hume Council is now on board to make this path happen. Will the Labor State Government come to the party?

The bike path currently finishes at Box Forest Road in Fawkner.

Extending the path up to Barry Road and Upfield station during the Camp Road level crossing removal would make a great deal of sense, opening up to many Hume municipality residents and cyclists a safe route to Brunswick, Coburg and the Melbourne CBD.
Continue reading

Advertisements

Threat to Merri Creek Path with Sale of Lakeside Secondary College site

20140726-Merri-creek-path-sale-lakeside-sc
Merri Creek forms an important parkland for the north-south length of Fawkner and Reservoir. It is also an important corridor for wildlife and for users of the Merri Creek Shared bike path which winds its way along the creek sometimes on the east and sometimes the west bank.

The path uses the east bank of the creek behind the Department of Education site in Reservoir, where Lakeside Secondary College once stood. The title to the this site at 31 Radford St, Reservoir extends down to the creek verge. The Educational Department wants to sell the property and has requested the site to be rezoned for Industrial use.

Several hectares of the site lie outside the school fence on a bend of the Creek and have been planted and managed for about 30 years by Darebin Council, as part of the Merri Creek open space corridor.

If the creek frontage is sold without transfer of title to the Crown or Darebin Council, access to and use of the Merri Creek Shared pathway could be threatened.
Continue reading